The Installation

The upper guide profiles are collected without attachment level and equalized just after the fixed dowel-nails. Step mounting rails of metal structures and frames to floor ceiling and pillars that are adjacent to walls or columns, not exceeding 1000 mm but not less than three fixtures on one profile. Extreme attachment plugs shall be installed no further than 500 mm from the end of the profile. By level (plumb line) in the guide profiles are established profiles rack at 600 mm. Their open side should look in the direction of installation – this is a classic German plant. First inserted into the lower rack and then into the upper guide profile.

Please note that the stand should be included in the guide on the ceiling at least 20 mm, and Rack height profile in the premises must be less than the height of the room by 10 mm. Connection profiles with each other, as a rule, with self-tapping screws ("bugs"). The method of punching a limb, in which a special prosekatel almost forgotten. Rack frame, adjacent to the walls or pillars, fastened with nails, dowel to the desired pitch (no more than 1,000 mm but not less than three fixtures on a single profile). Extreme fixing dowel-nails should be installed no further than 500 mm from the end of the profile. Door frames should be installed simultaneously with the installation of the frame walls, which required on both sides of the door frame to mount additional support rack profiles. Possible to install door and window frames of any material: wood, aluminum, plastic, metal ceramics.